Eighteen years on tools, mostly on cleared and vetted military or government estates. Footings to surfacing, drainage to kerbs, delivered with our own crews, our own plant, and one phone number when the programme moves.
Established 2008. Same trade, same standards.
Own team, own plant.
Three years on a continuously vetted secure programme.
Foundations, drainage, services.
UKAS-accredited civils for commercial, industrial and secure-site programmes. Full risk assessments and method statements per task. Clients include EMCOR, Wilson James, Vinci, NG Bailey, BAM Nuttall and Bilfinger.
Footings & foundations
Foundation slabs, footings, pad-and-strip foundations. Concrete to spec, poured to tolerance, cured under controlled conditions.
Drainage & sewers
Surface and foul drainage, attenuation, pumping stations, services trenching. Sized for the catchment, signed off to spec.
Services installations
Ducted services, IT and security infrastructure runs on secure-site programmes. Installed under continuous vetting where required.
Roads, kerbs, highway-grade.
External works delivered with our own team and own plant. From single access lanes to multi-acre packages, finished to highway-grade specification.
Roads & footpaths
Sub-base, base course, surface course. Compaction tested, finishes laid to highway-grade tolerances.
Car parks & external works
Multi-acre external-works packages. Bays marked, drainage tied in, line-painting to clients spec.
Kerbs & surfacing
Kerb-laying, edgings and channels. Tarmac, block paving, resin-bound finishes.
Owned plant, own operators.
Excavators, dumpers and telehandlers from 1-tonne micros to 5.6-tonne loadalls, operated by our own CPCS-trained crews.
Case CX37C
3.7 tonne excavator
Takeuchi TB230
2.9 tonne excavator
Takeuchi TB219
2.1 tonne excavator
Takeuchi TB210R
1 tonne micro excavator
Bobcat E85
8.5 tonne excavator
Thwaites 570
3 tonne forward-tipping dumper
Thwaites 573
3 tonne swivel-tipping dumper
JCB 527-55
5.6 tonne loadall / telehandler
Bobcat 6m
6m reach telescopic handler
Talk to us about the job.
A drawing, a brief, a site walk. A team member is reachable on the office line during working hours, or via 24-hour scaffolding callout for urgent works.